RTA Next DRAFT RTA Project List

I. Roadway (multimodal) Corridor ElementRTA Project Budgets (000s) *Committed Non-RTA Dollars
(000s)
Construction Start Period
1.   State Route 210: Palo Verde Road to Ajo Way (Milepost 4.56 to Milepost 6.16) Extension of State Route 210 to I-10 (Stages 1&2); additional travel lanes, interchange and drainage improvements$25,000$300,9212nd Period
2.   State Route 210: Ajo Way to I-10 (Milepost 6.16 to Milepost 7.31) Extension of State Route 210 to I-10 (Stage 3); additional travel lanes, interchange and drainage improvements$25,000$168,1743rd Period
3.   Sonoran Corridor: I-19 to I-10: Funding provides for corridor plan updates for a future limited-access roadway, and initial right-of-way acquisition$5,000 1st Period
4.   Cortaro Road/I-10 traffic Interchange New grade-separated traffic interchange over the railroad tracks and I-10, including the widening of Cortaro Road and mainline 1-10, and bicycle and pedestrian improvements$94,749$125,0001st Period
5.   Tangerine Road/I-10 Traffic Interchange New grade-separated traffic interchange over the railroad tracks, including the widening of Tangerine Road and mainline I-10, and bicycle, pedestrian and associated drainage improvements$57,716$100,0002nd Period
6.   Lambert Lane: Thornydale Road to Rancho Sonora Drive Widen to a 4-lane roadway with bicycle, pedestrian and drainage improvements$50,159$1,0001st Period
7.   Shannon Road: Lambert Lane to Tangerine Road including Naranja Drive to Ironwood Ridge High School Construct new 3-lane roadway with new sidewalks, bike lanes, associated drainage and traffic improvements$23,430$1,0001st Period
8.   South Camino de Oeste: Calle Torim to Valencia Road Widen to a 3-lane roadway with bicycle, pedestrian and drainage improvements$23,578 1st Period
9.   Drexel Road: Cardinal Avenue to Mission Road Widen to a 3-lane roadway with bicycle, pedestrian, and associated drainage improvements$14,288 3rd Period
10. Thornydale Road: Cortaro Road to Camino del Norte Widen to a 4-lane roadway with bicycle, pedestrian and associated drainage improvements$88,973 1st Period
11. Irvington Road: Ajo Highway to Mission Road Modernize existing roadway including bicycle, pedestrian and intersection improvements, along with improved connection to Ajo Highway$21,874$4,1083rd Period
12. Orange Grove Road: La Cholla Boulevard to Oracle Road Widen to a 4-lane roadway with bicycle, pedestrian and associated drainage improvements$22,623$4,6813rd Period
13. Valencia Road: Mission Road to Camino De Oeste Widen to a 6-lane divided roadway with bicycle, pedestrian and associated drainage improvements$45,000$38,0001st and 2nd Periods
14. Colossal Cave Road: I-10 to Camino Loma Alta Widen to a 4-lane divided roadway with bicycle, pedestrian and associated drainage improvements and grade separation over the railroad tracks$157,344$3,0693rd and 4th Period
15. La Villita Road: Sahuarita Road to Nogales Highway Construct improvements to existing roadway, plus new section of 2-lane roadway with bicycle, pedestrian and associated drainage improvements$31,084 1st Period
16. Pima Mine Road: I-19 to Nogales Highway Widen to a 4-lane roadway with bicycle, pedestrian and drainage improvements.$39,020 2nd Period
17. Ina Road: I-10 to Camino de la Tierra Widen to a 6-lane roadway with bicycle, pedestrian and associated drainage improvements$44,985 3rd Period
18. Drexel Road: Midvale Park Road to Calle Santa Cruz Construct a new 2-lane bridge over the Santa Cruz River, including bicycle and pedestrian improvements$20,829$19,0001st Period
19. Drexel Road/I-19: Calle Santa Cruz to South 12th Avenue New bicycle and pedestrian connections across I-19$8,640 2nd Period
20. Drexel Road: South 12th Avenue to Country Club Road Modernize existing corridor including bicycle, pedestrian and associated intersection improvements$73,902 2nd Period
21. Drexel Road: Mission Road to Midvale Park Road Removal of travel lanes to add bicycle, pedestrian and associated intersection improvements, along with a new bridge over the Santa Cruz River$22,453 1st Period
22. Irvington Road: 15th Avenue to Tucson Boulevard Modernize existing roadway including bicycle, pedestrian and associated intersection improvements$60,100 3rd Period
23. Campbell Avenue: Benson Highway to Valencia Road Modernize existing roadway including bicycle, pedestrian and associated intersection improvements$32,000 3rd Period
24. Mary Ann Cleveland Way Widening $50,000 4th Period
25. Prince Road: Romero Road to Country Club Road Modernize existing roadway including bicycle, pedestrian and associated intersection improvements$70,000 2nd Period
26. La Cholla Blvd. Modernization Project $8,500 4th Period
27. 29th Street Removal of travel lanes to add bicycle, pedestrian and associated intersection improvements$26,000 4th Period
28. Mission Road Removal of travel lanes to add bicycle, pedestrian and associated intersection improvements$10,000 4th Period
29. Camino Seco Modernization Project $10,000 4th Period
30. Harrison Road Expansion, Golf Links Road to Irvington Road $39,000 2nd Period
Subtotal***$1,201,247$764,953 
2006 RTA Plan Deferred Projects**RTA Project Budgets (000s) *Committed Non-RTA Dollars
(000s)
Construction Start Period
31. First Avenue: Orange Grove to Ina Road Modernize existing 3-lane roadway including bicycle, pedestrian and associated drainage improvements $10,0691st Period
32. Houghton Road: Broadway Blvd to Tanque Verde Road Widen roadway to a combination of 3 and 4 lanes with bicycle, pedestrian and associated drainage improvements$43,629 1st Period
33. Silverbell Road: Camino del Cerro to Ina Road Widen to a 4-lane divided roadway with bicycle, pedestrian and associated drainage improvements
$122,914
 1st Period
34. 22nd Street: I-10 to Kino Parkway Reconstruct to a 4-lane divided roadway with bicycle, pedestrian and associated drainage improvements, and grade separation at the railroad tracks$72,030 1st Period
Subtotal***$238,573$10,069 
Element Subtotal***$1,439,820$775,022 
II. Safety, ADA and Active Transportation ElementRTA Project Budgets *Committed Non-RTA Dollars Construction Start Period
35. South Tucson Safety Projects$25,000 1st through 4th Periods
36. Pedestrian Improvements - Tucson$45,000 1st through 4th Periods
37. Bikeway Improvements - Tucson$45,000 1st through 4th Periods
38. Safety Initiatives - Safe Routes to School Projects$4,000 1st through 4th Periods
39. Traffic Signal Upgrades - Tucson$30,000 1st through 4th Periods
40. Pima County - Green Valley Projects$5,800 1st through 4th Periods
41. Non-Tucson/South Tucson Safety and Active Transportation Element Projects$52,000 1st through 4th Periods
Element Subtotal***$206,800  
III. Arterial Reconstruction ElementRTA Project Budgets *Committed Non-RTA Dollars Construction Start Period
42. Golf Links Road: Wilmot Road to Houghton Road$20,000 4th Period
Element Subtotal$20,000  
IV. Environmental ElementRTA Project Budgets * Construction Start Period
43. Wildlife Linkages$25,000 1st through 4th Periods
Element Subtotal$25,000  
V. Transit ElementRTA Project Budgets *Committed Non-RTA Dollars Construction Start Period
44. Stone Ave. Bus Rapid Transit$70,000$70,000Subject to Grant Funding
45. Current Weekday/Evening/Weekend/Paratransit Bus Service$227,000 1st through 4th Periods
46. Bus Frequency/Route and Area Expansion$121,000 1st through 4th Periods
47. Current Express/Shuttle Fixed/Dial-a-Ride/Paratransit$192,000 1st through 4th Periods
Element Subtotal***$610,000$70,000 
VI. Debt Service, RTA and Small Business Program Admin Costs.RTA Project Budgets *Committed Non-RTA Dollars Construction Start Period
48. Administrative Services, per RTA Statutes$24,666 1st through 4th Periods
49. Small Business Assistance Program$10,000 1st through 4th Periods
50. Debt Service Reserve for Bond Interest Expense$65,000 1st through 4th Periods
Element Subtotal***$99,666  
Contingency   
Overlap Funding (Funds collected in April, May and June 2026 for remaining 2006 plan projects)$40,000  
Contingency (Reserve funds for inflationary cost increases)$25,300  
Subtotal***$65,300  
Grand Total$2,466,586  

Note: All investment amounts, project scopes and schedules are recommendations for discussion and subject to change by the RTA Board.
* Cost reflects RTA portion of the budget. RTA funding per project cannot exceed the budgeted amount. Total RTA funding cannot exceed the total of the projected new RTA revenues.
** Projects are deferred to RTA Next due to recommended changes to project scopes, as noted above, from original 2006 voter-approved plan.
*** Current subtotals subject to change.
† Dollar amounts pledged to projects and to be provided by entities other than the RTA.
▲ The 20-year plan is divided into four fiscal year periods: FYs 2026-2030, FYs 2031-2035, FYs 2036-2040 and FYs 2041-2045.
❖ Projects end limits and scope have not yet been determined.
The Regional Transportation Authority is a state-established taxing district within Pima County. In 2006, voters approved a 20-year regional transportation plan and half-cent sales tax from the district to fund it. RTA Next is the development effort for a new 20-year RTA plan. Draft contents of the plan are shown above for public review and feedback. Comment at RTANext.com.